How a new system comes together
- Site and soil evaluation. Texas requires this before a system is designed. Around Lake Whitney it usually tells you how deep the rock is and whether a conventional field will work.
- Design. The system is sized for the house, mainly by bedrooms and square footage, and laid out around setbacks from wells, property lines and the water.
- County permit. Hill County Development Services has to approve the plan before anything is dug. We help put that package together.
- Install. We set the tank, run the lines, and build the drain field, or set the aerobic unit and lay out the spray area.
- County sign-off. The county checks the work before it is covered up.
Conventional or aerobic
Where there is enough suitable soil, a conventional tank and trench field is the simpler system to live with. On a lot of the lake lots, and on some of the clay ground in the eastern part of the county, there is not. That call comes from the evaluation. See aerobic system installation for how those go in.
What to have ready
- The property address or a map pin
- Where the house or cabin will sit, if you know
- Number of bedrooms and a rough square footage
- Where any water well is or will be
The state side of the rules is on TCEQ's OSSF permit page.